Friday 24 June 2016

New Floors - Day 3



Almost done, just the final door and furniture trims left to do,





The entrance hall was finished today. It looks really good, and I'm so glad I chose the lighter-coloured stair carpet.














Charlie managed the threshold between sitting room and hallway extremely well.


Now we just need to replace that terrible door frame colour. MWNN, some years ago "What colour do you want on the door-frames?" Me "Any colour but pink".



















The threshold between hall and shower room will be covered by a metal bar, inside the shower room.













The parquet is such a good match for the oak hall-table.




















We're very pleased with our beautiful new entrance hall floor.



Ron is not so pleased. He hates the new floors - ball-games are banned,